Project Type Influencing
Project Scope Limited

Purpose

A1. This paper sets out the plan to influence the proposed Amendments Power Purchase Agreements (the Amendments), which are expected to be published by the IASB in May 2024. The tentative proposals are included in the IASB March 2024 Staff Paper agenda reference 3A and are summarised in the UKEB March IASB General Update.

Background

A2. In June 2023, the IFRS Interpretations Committee referred a request to the IASB¹ about whether IFRS 9 Financial Instruments paragraphs 2.4 to 2.6 (the ‘own-use' exception) could be applied to physical power purchase agreements (PPAs).² Following this referral, the IASB added a research project on this topic to its workplan.³

A3. Stakeholders also told the IASB that, by analogy with a March 2019 Interpretations Committee decision⁴ on load-following swaps,⁵ they were unable to designate virtual PPAs⁶ as hedging instruments in a qualifying hedging relationship.

A4. Developments in reporting of greenhouse gas emissions (such as Streamlined Energy and Carbon Reporting Regulations) and in relation to reporting progress against targets to reduce greenhouse gas emissions (under Task Force on Climate-related Financial Disclosures and in the future under IFRS S2 Climate-related Disclosures) have increased focus on Scope 2 emissions. It appears that, increasingly, entities are entering into PPAs for the supply of renewable electricity, validated by third-party renewable energy certificates (RECs), as well as for price security.

A5. Consequently, in December 2023 the IASB decided to make narrow-scope amendments to IFRS 9 in order to permit PPAs to meet the 'own-use' and hedge accounting requirements, and to require entities to provide relevant disclosure.⁷ At the January 2024 ASAF meeting, preliminary feedback was provided on the IASB proposals. The IASB tentatively voted in favour of the staff proposals, set out below, at its March 2024 meeting.⁸

Tentative decisions

A6. The IASB has tentatively decided to extend the 'own use' requirement to those contracts for renewable electricity for which the source of production is nature-dependant, with the effect that the time or volume of supply cannot be guaranteed, and where the purchaser is exposed to substantially all of the volume risk under the contract through pay-as-produced features. Examples provided include wind, solar and hydroelectricity.

A7. The IASB also has tentatively decided that the purchaser under the contract be required to consider the purpose, design and structure of the contract, and whether the volume expected to be delivered under the contract continues to be consistent with the entity's expected purchase or usage requirements.

A8. In relation to the hedge accounting requirements, the IASB has tentatively decided that if certain criteria are met, entities would be permitted to designate a variable nominal volume or quantity of forecast sales or purchases of renewable electricity as the hedged item in a cash flow hedge. These criteria are as follows:

  1. The volume of the designated hedged item is specified as a proportion of the variable volume of the hedging instrument.
  2. The hedged item and hedging instrument are measured using the same volume assumptions, but other assumptions such as the pricing structure reflect the nature of the hedged item as renewable electricity.

A9. The designated forecast sales or purchases of electricity are:

  1. For purchasers – highly probable if the entity has sufficient highly probable forecast purchases that exceed the estimated variable volume (or quantity) to be designated by the entity as the hedged item.
  2. For sellers – not required to be highly probable as the designated quantity of sales is certain to be hedged if it occurs.

A10. The hedging proposals are expected to affect only IFRS 9 and will not change IAS 39 Financial Instruments: Recognition and Measurement.

A11. The IASB tentatively decided to require disclosure of the following information for all contracts for renewable electricity:

  1. The terms and conditions of relevant contracts, including the contracts' duration, type of pricing, minimum or maximum quantities, cancellation clauses and whether they include renewable energy certificates.
  2. The net volume purchased or the total volume for which amounts were net-settled for the reporting period, and an explanation of any significant variances in the volume. Entities are also required to disclose the average market price per unit of electricity for the reporting period.
  3. Either the fair value of contracts accompanied by the information required by paragraph 93(g)-(h) of IFRS 13 Fair Value Measurement or the volume expected to be sold or purchased over the remainder of the contract, which could be provided as a range, and the assumptions supporting that analysis.

A12. The IASB tentatively decided that entities will apply the amendments retrospectively. However, restatement of comparatives would not be required. The hedge accounting requirements should be applied prospectively. Where an entity can consider existing arrangements without hindsight, it may alter the designation of an existing hedged item and it may also hedge relationships from the time the criteria would have been met.

Project plan rationale

A13. The following considerations have shaped the project plan.

The scope of the IASB project is to make limited-scope amendments to IFRS 9

A14. Following stakeholder input and feedback, the IASB tentatively decided to scope the project as limited to contracts for renewable electricity with a nature-dependant source and in which the purchaser is exposed to substantially all the volume risk.⁹

A15. The Amendments are therefore not expected to change the principles of IFRS 9. However, existing practice may change, if the Amendments specify requirements in areas in which entities previously exercised judgement or indicate required accounting for contracts that are not specifically within scope. The project may also result in some additional disclosure requirements.

A16. The Amendments may affect any entity that has entered into a PPA.

Renewable energy PPAs are increasing in prevalence in the UK

A17. Research indicates that renewable energy PPAs have been around in the UK for some time, but have become more prominent in recent years. ¹⁰ As at November 2023, the UK was regarded as the fourth most attractive global market for renewable energy PPAs. ¹¹

A18. 63 UK listed IFRS reporters in FY2022/2023, from across a range of sectors, referred to PPAs within their annual report. This indicates that they are relatively widely used.

A19. 12 entities referred to PPAs in their financial statements, of which eight were in the utilities and energy sectors

Initial engagement with UK stakeholders suggests they welcome the project

A20. At the February 2024 Investor Advisory Group (IAG) and Preparer Advisory Group (PAG), the March 2024 Accounting Firms and Institutes Advisory Group (AFIAG) and the January 2024 Financial Instruments Working Group (FIWG), stakeholders welcomed the project. However, their initial feedback, together with our desk-based research, based on early, high-level IASB staff proposals, has highlighted areas where the ED will require close review.

Setting up an ad-hoc advisory group is not necessary

A21. The UKEB standing advisory groups are well placed to provide feedback on this limited scope project, so it is not considered necessary to set up a separate ad-hoc advisory group specific to this project.

Project milestones

A22. A proportionate approach is proposed, incorporating mandatory milestones listed in paragraph 5.3 of the UKEB's Due Process Handbook (Handbook). The table below provides a brief description of the work we have done and that we intend to do as part of this project.

A23. Future dates are based on current expectations and are, therefore, subject to subsequent modification. The Board will be alerted to any significant changes.

Milestone/activity Brief description Status
Technical project added to UKEB technical work plan (mandatory) [Handbook 4.30(b)] Added to UKEB technical work plan. Completed.
Education session on IASB proposals on PPAs (optional) [Handbook 4.10] An education session on the tentative proposals will be provided to the Board before the public meeting, at which this document will be discussed, in April 2024. Planned for the April 2024 Board meeting.
Desk-based research (optional) [Handbook 5.9] The Secretariat has begun its programme of desk-based research, to include review of IASB staff papers, publications from regulators, accounting firms and other relevant sources including accounting manuals as well as the ED when published. In progress.
Outreach activities (mandatory) [Handbook 5.11] We have already begun to engage with IAG, PAG, AFIAG and FIWG and will continue to engage with members at the June and July 2024 meetings. In addition, we plan to seek feedback from relevant specialists. In progress.
Project Initiation Plan (PIP) (mandatory) [Handbook 5.4 to 5.8] This paper To be brought to April 2024 Board meeting, ahead of the IASB’s publication of the ED.
Draft comment letter (DCL) published for comment (generally mandatory) [Handbook paragraphs 5.13 to 5.17] The Secretariat will publish the approved DCL for public comment for 30 days following the May 2024 Board meeting. The UKEB will make a decision at the May 2024 board meeting on whether a longer public comment period may be appropriate and practicable. If the ED is not published by 13 May 2024, the UKEB will publish the approved DCL for public comment for a minimum of 30 days following the June 2024 Board meeting. As soon as possible after the May 2024 Board meeting, or if not possible, as soon as possible after the June 2024 Board meeting.
UKEB submits final comment letter (FCL) to the IASB (mandatory) [Handbook paragraph 5.18] The IASB comment period is expected to close in mid-August 2024. The Secretariat will submit the FCL to the IASB as soon as possible following approval at the July 2024 UKEB meeting. If the ED is published after 13 May 2024, or if the UKEB decides at the May 2024 UKEB meeting that a longer comment period is required for the DCL such that the FCL cannot be considered at the UKEB meeting in July 2024, an ad-hoc meeting will be scheduled in August 2024 to permit the Board to review the FCL, permitting submission to the IASB before the 90-day comment period ends. A late paper may be required. As soon as possible after the July 2024 Board meeting, or if not possible due to the timing of the publication of the ED, as soon as possible after the August 2024 Board meeting.
Feedback statement and due process compliance statement for influencing stage of project Secretariat publishes Feedback Statement and Due Process Compliance Statement on the UKEB website. To be completed.

Resources allocated

A24. On the basis of this project plan, we consider that a project team consisting of one Project Director (0.8 FTE) and ad-hoc project manager support as available and technical support and oversight from a Senior Project Director should ensure the project timelines are achievable. Input from the economics team and communications support will be obtained as appropriate. Sufficient resources have been allocated in the Work Plan.

Detailed project timeline assuming IASB publishes ED on or before 13 May 2024, and FCL discussed at July Board meeting

Date Milestone
October 2023 to April 2024 Preliminary analysis and outreach before publication of Exposure Draft
26 April 2024 Board: Education session on proposed topics for Amendments.
26 April 2024 Board: Discusses and approves Project Initiation Plan (this document).
May 2024 IASB publishes ED with 90-day comment period.
17 May 2024 Secretariat: Submits DCL to Board (late paper if required, approved by the Board in April 2024).
24 May 2024 Board: Discusses and approves DCL.
29 May 2024 Secretariat: Alerts key stakeholders to publication of DCL.
29 May 2024 to 28 June 2024 Minimum 30-day comment period.
18 July 2024 Board: Discusses and approves Final Comment Letter (FCL) and Feedback Statement, and reviews draft Due Process Compliance Statement.
As soon as possible after Board discussion Secretariat: Submits FCL to IASB and publishes FCL on website.
19 September 2024 Board: Notes Due Process Compliance Statement.

Project timeline for "Influencing Project - Power Purchase Agreements", detailing key milestones, deadlines, and board approvals from February to September 2024.

Footnotes


  1. The IFRIC Staff Paper Agenda Reference 2 summarises the IFRIC initial considerations and paragraph 85 includes the recommendation and rationale. The fact patterns submitted were summarised in the UKEB April 2023 IASB General Update Appendix 8H. ↩

  2. Physical power purchase agreements are those in which an energy generator physically delivers power to a user, often called an offtaker, for a price. ↩

  3. See the IASB 25 July 2023 PM meeting and the July 2023 Agenda Paper 12. See September 2023 IASB General Update Paper 5 Appendix B for a summary of the ASAF meeting at which national standard-setters were asked for their views on the prevalence of PPAs, their effects within financial statements and the scope of any potential solution. ↩

  4. See the IFRIC March 2019 decision and accompanying staff paper. ↩

  5. In that decision, the Interpretations Committee considered that the forecast energy sales lacked the required specificity to be designated as a hedged item and therefore did not qualify for hedge accounting. See IAS 39 Implementation Guidance F.3.10: "[...] a forecast transaction cannot be specified solely as a percentage of sales or purchases during a period." ↩

  6. Virtual PPAs are typically structured as a 'contract for difference' between the fixed price (per MW of energy) determined in the virtual PPA and the spot price at which energy could be purchased from the grid (i.e. net settled swaps). No physical energy is exchanged. ↩

  7. See December 2023 IASB Staff Paper agenda reference 3 and January 2024 IASB General Update Paper 5 Appendix A ↩

  8. See January 2024 ASAF meeting, the February 2024 IASB General Update, IASB March 2024 Staff Paper agenda reference 3A, March 2024 Staff Paper agenda reference 3B, March 2024 Staff Paper agenda reference 3C and the March 2024 IASB General Update. ↩

  9. IASB March 2024 Staff Paper agenda reference 3A. ↩

  10. Bird and Bird Corporate PPAs: An International Perspective 2022 edition ↩

  11. EY Renewable Energy Country Attractiveness Index November 2023 edition ↩